Constructum Code builds commercial projects across London as main contractor — offices, retail units and mixed-use premises. We take on extensions and structural alterations, full refurbishment and reconfiguration, mechanical and electrical replacement, and fit-out, on a single contract.
We work under JCT — Minor Works on straightforward schemes, Intermediate where there are named specialists or the project needs fuller contract machinery — and act as Principal Contractor under CDM 2015. Our largest contract currently on site is £900,000.
Interested in Commercial Builds and Refurbishment?
The work we take on
Commercial extensions and structural alterations
Adding floor area to a commercial building, forming or widening openings in loadbearing walls, installing steel frames, rebuilding roof structures, and inserting mezzanines. This is where a project’s real risk sits — in the structure, the foundations and the roof, rather than in the partitions.
Office and commercial refurbishment
Strip-out, reconfiguration and rebuild of a whole premises: removing internal walls to create open-plan floors, reworking circulation, and bringing the building fabric, insulation and glazing up to current standards within the same programme.
Mechanical and electrical replacement
Complete replacement of heating, power, lighting, ventilation and data, commissioned and certified, through our building services team and named specialists. On older commercial buildings this is frequently the largest single element of a refurbishment, and it determines how the building performs once it is occupied.
Retail and office fit-out
Partitions, ceilings, flooring, joinery, decoration, WC facilities and kitchens, specified and installed to commercial standards.
Change of use conversions
Converting premises between uses — retail to office, office to residential, ground-floor commercial with residential above — including the structural work and the compliance upgrades a change of use brings with it, alongside the planning consent secured by the design team.
Commercial projects
Office extension and refurbishment, Richmond TW9
A complete commercial refurbishment of an office building, combining structural work and fit-out on one contract:
- Two-storey rear extension across the first and second floors
- Complete demolition and reconstruction of the roof structure
- Internal walls removed and the interior reconfigured as open-plan office space
- Full mechanical and electrical replacement, including a new heating system and complete electrical installation
- Fit-out throughout: flooring, decoration, two WC facilities and two kitchenettes
- New first-floor balcony and rear terrace
Approximate construction cost: £240,000.
Currently on site
We are currently delivering a contract worth £900,000, started in September 2026 and running to a fixed 35-week programme, with a quantity surveyor and contract administrator appointed. Constructum Code is main contractor and Principal Contractor. The scheme pairs a structural extension with a specialist hydrotherapy pool installation — plant, water treatment, heating and dehumidification — delivered through named specialist subcontractors.
How we work
1. Tender and pre-construction
We price from your team’s drawings and specification on traditional single-stage tenders, and take on two-stage appointments where early contractor involvement is useful — buildability, sequencing and cost certainty developed alongside the design before the contract sum is fixed. Estimating and delivery sit with the same people, so the assumptions behind the price carry through to site rather than being rediscovered there.
2. Survey and the existing building
Existing structure, roof condition, drainage, incoming services and their capacity, and access for plant and materials. On any building constructed before 2000, a refurbishment and demolition asbestos survey is arranged before intrusive work begins. Most commercial overruns start with something found in the fabric that nobody looked for, so this stage is where the programme is protected.
3. Approvals and consents
Planning and change of use consents are secured by the design team before construction. From there we coordinate the building control route and stage inspections, the fire strategy and accessibility requirements as they apply on site, the structural engineer and any consultants each stage requires, and — on leasehold premises — the information the landlord needs for the licence to alter.
4. Contract and Principal Contractor duties
Works are executed under the appropriate JCT form, which sets out the programme, the payment schedule and the remedies for delay. Where we are appointed Principal Contractor under CDM 2015, we produce the construction phase plan, hold the risk assessments and method statements, manage site safety and the subcontract chain, and maintain the information the Principal Designer needs for the health and safety file. We carry £10m employers’ liability, £5m public liability and £1m professional indemnity, with certificates provided as standard at tender stage.
5. Construction and progress
The programme is set backwards from the date the premises need to be operational, through commissioning, finishes, services, structure and approvals, so the critical path is visible from the outset. Progress meetings and interim valuations run monthly, or more often where the programme warrants it. Variations are instructed, priced and agreed as they arise, so the account stays current rather than arriving at the end. Where the building remains in use, or neighbouring units are trading, works are phased around access, occupancy and trading hours.
6. Practical completion and handover
Snagging closed out, mechanical and electrical installations commissioned and certified, the building control completion certificate obtained, and the handover package issued: O&M manuals, as-built information, test and commissioning certificates, and manufacturer warranties on installed systems.
7. Rectification period
Defects arising in the twelve months after practical completion are made good under the contract, ahead of the final certificate and the release of retention. Structural work carries a 10-year warranty.
What a commercial project costs
Commercial projects are priced individually, because the scope varies so widely. What a refurbishment costs depends on how much of the building changes.
The main variables are:
- How much structure is involved. An interior reconfiguration and a two-storey extension with a new roof sit at opposite ends of the range.
- The condition of the existing services. Whether heating, power and ventilation are being upgraded or replaced entirely, and whether the incoming supply has the capacity for what you are installing.
- Compliance upgrades. Fire separation, means of escape and accessibility work triggered by the scope or by a change of use.
- Phased work around a trading business costs more than an empty building, because the programme is longer and the working hours are constrained.
- The difference between a functional fit-out and a client-facing one.
As a reference point, the Richmond office project — a two-storey extension, a rebuilt roof, full M&E replacement and a complete fit-out — was approximately £240,000.
We price after the survey, so the estimate reflects the actual condition of the building.
Common questions
What size of project do you take on?
The Richmond office refurbishment was approximately £240,000. Our largest contract currently on site is £900,000, over a 35-week programme, with a quantity surveyor and contract administrator appointed and Constructum Code as Principal Contractor. We contract under JCT Minor Works and Intermediate, with the form set by the complexity of the works rather than the value.
How do you prefer to be appointed?
Any of the usual routes. Direct or negotiated appointment, where we survey, price and agree the contract sum with you without a competitive tender — common on private work and on repeat projects. Single-stage tender, pricing a fully designed scheme against drawings and specification. Or two-stage, where we are brought in earlier to work on buildability, sequencing and cost alongside the design team before the sum is fixed. On refurbishment of an existing building, the negotiated and two-stage routes tend to produce the more reliable number, because the survey and any opening-up happen before the price is fixed rather than after.
Can we keep trading during the work?
Often, depending on the scope and the layout. Where the building stays in use, work is phased so occupied areas remain accessible and compliant, with the disruptive elements scheduled outside trading hours where the programme allows. Where the building is empty, the programme is shorter and the cost is lower — if you have flexibility on timing, that is usually where the savings are.
What if the premises are leasehold?
We work alongside your surveyor or agent through the licence to alter, and we programme it as a lead item rather than a formality, because consent frequently takes longer than clients expect. Reinstatement obligations at the end of the term are worth settling before the design is fixed, since they affect what is worth installing.
What about asbestos?
On any building constructed before 2000 we arrange a refurbishment and demolition survey before intrusive work begins, and where material is present it is removed by a licensed contractor ahead of the works. It is identified at survey stage and priced into the programme rather than found once the strip-out has started.
Do you work with our architect or project manager?
Yes. We build to drawings produced by your architect and engineer and work alongside the professional team through to handover, under JCT and with the contract administrator running the process. Where a client has not yet appointed a practice, we can introduce ones we have worked with.